Joined
·
72 Posts
Fred is still a work in progress, but is getting much closer to me being able to ride him. So far the tally of updates:
Tach Relocated
De Beavered
Lowered 2.75"
160 on the front
Suzuki engine bars
New forward controls on 3" back, .5" up
Braided +3" cables are on the bike
Still waiting for the 3" risers to come in, need to run a rear brake line to the master cylinder, shifter linkage still needs to be finished and then hopefully I can get on the road.
Tach Relocated
De Beavered
Lowered 2.75"
160 on the front
Suzuki engine bars
New forward controls on 3" back, .5" up
Braided +3" cables are on the bike
Still waiting for the 3" risers to come in, need to run a rear brake line to the master cylinder, shifter linkage still needs to be finished and then hopefully I can get on the road.